Opened Floor Plan with New Headers – Shiner, TX 04.03.18 Removed three load bearing walls and three closets and replaced with new Power Beam headers to open up the floor plan. Posted in Carpentry« Tiled Bath/Shower Surround – Hallettsville, TXShiplap Wall – Hallettsville, TX » Back To Top no comments Add a comment... Your email is never published or shared. Required fields are marked * Post Comment Δ